3 – Kendall Corridor

Projected Timeline: Currently, there is no Projected Timeline

Projected Schedule:

3 – Kendall Corridor Map:

Link: www.fdotmiamidade.com/kendallrapidtransit

Owner: PD&E by FDOT District 6 and Land Use & Visioning by Miami-Dade TPO

Project Contacts: Jeannette Lazo, PIO, (305) 573-0089, jeannette@lscprgroup.com
FDOT Project Manager: Teresita Alvarez, PE, (305) 640-7557, teresita.alvarez@dot.state.fl.us

Project Description
: Implementation of the East-West rapid transit corridor along SR 94/SW 88 Street/Kendall Drive from approximately SR 997/SW 177 Avenue/Krome Avenue to the Dadeland North Metrorail Station.

Project Goals: The study aims to improve mobility by offering alternate transportation options with competitive travel times; increase connectivity to the regional transit system and access to major destinations; encourage pedestrian and bicycle travel to reduce the growing number of automobile trips; Support sustainable development including social and economic opportunities that enhance quality of life in the community.

Project Benefits:

  • Connects Dadeland to Krome Avenue
  • Most Congested Roadways
  • Within 2-mile radius: 190,000 residents and 111,000 jobs

Possible Modes:

  • Bus Rapid Transit (BRT)
  • Light Rail Transit (LRT)
  • Heavy Rail Transit (HRT)
  • Metrorail at-grade (powered by overhead lines), on exclusive lanes.